Glencoe Ski Centre

Date Completed:


Key Deliverables

  • Appointed to prepare and submit the documentation for Stage 1 and 2 Applications to the Department for Transport (DfT) as required under the Cableway Installation Regulations 2004.  This process involved the preparation of the Safety Report for submission and subsequent acceptance by the DfT for the modification work on the Access Chairlift in 2015 and for a re-located new build surface tow the Coire Pollach.
  • Contract retained services for competent advice.

Andy Meldrum
Managing Director, Glencoe Ski Centre

Buying Glencoe ski centre 10 years ago was a daunting prospect particularly from an HSE perspective as most of the plant and infrastructure on the mountain was ageing and in a state of disrepair. 

For the last 7 years the support, guidance and advice provided by Sequs (Jacqueline) has been invaluable in helping us thrive and grow the business. Sequs have always been there to help when needed and have often gone above and beyond.